Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
23% of nearby decided applications were refused. The site check found 326 decisions within 5 km, 2 exact-site or onsite candidate records, and 441 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
441 structured nearby appeal records.
441 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
1) PERMISSION TO CONSTRUCT A PITCHED ROOF TO EXISTING EXTENSION TO SIDE OF DWELL
Permission to install Solar Panels on the roof of existing Feed Store and
Permission to (1) Construct a fully serviced dwelling house with connection to p
(1) RETENTION FOR EXISTING MOBILE HOME NO. 1 FOR TEMPORARY RESIDENTIAL ACCOMMODA
PERMISSION TO CONSTRUCT 2 NO FULLY SERVICED SEMI DETACHED DWELLING HOUSES
Permission to 1) construct a fully serviced dwelling house with connection to
The brief summarizes the pattern across all 326 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20180215The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief