Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
19% of nearby decided applications were refused. The site check found 250 decisions within 5 km, 6 exact-site or onsite candidate records, and 365 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
365 structured nearby appeal records.
365 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
RETENTION PLANNING PERMISSION FOR A) THE SUBDIVISION OF A DWELLING INTO TWO DWEL
Permission to construct a 76.57m2 extension to existing dwelling house
Permission to erect a domestic storage shed with ancillary works
Permission to revise our boundaries and relocate our sewerage treatment plant
PERMISSION TO REVISE BOUNDARIES AND RELOCATE SEWERAGE TREATMENT PLANT FROM
Permission to erect an extension to existing dwelling house to provide
The brief summarizes the pattern across all 250 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20180927The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief