Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
26% of nearby decided applications were refused. The site check found 500 decisions within 5 km, 1 exact-site or onsite candidate record, and 743 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
743 structured nearby appeal records.
743 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
RETENTION PLANNING PERMISSION FOR THE ADDITION OF TWO WINDOWS TO THE SIDE ELEVAT
Permission for development which will consist of a) removal of the existing
Permission to erect a two-storey dwelling with services
PERMISSION FOR ERECTION OF A FULLY SERVICED DWELLING HOUSE WITH ASSOCIATED SITE
PERMISSION TO ERECT A DOMESTIC GARAGE/STORAGE SHED WITH ANCILLARY SITE WORKS
PERMISSION FOR THE FOLLOWING DEVELOPMENT (ORIGINAL PLANNING REF: 20070045) FOR R
The brief summarizes the pattern across all 500 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20180969The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief