Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 326 decisions within 5 km, 1 exact-site or onsite candidate record, and 492 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
492 structured nearby appeal records.
492 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
PERMISSION TO ERECT A SERVICED DWELLING HOUSE AND DETACHED DOMESTIC GARAGE
RETENTION FOR THE FOLLOWING (A) REVISED POSITION OF ON-SITE SEWAGE FACILITIES
RETENTION OF DETACHED GARAGE TO REAR OF DWELLING HOUSE
PERMISSION FOR ERECTION OF A MANURE STORAGE SHED AND EFFLUENT STORAGE TANK AND A
Permission to erect a single-storey dwelling with domestic garage, services
Permission for the erection of a granny flat with connection to existing
The brief summarizes the pattern across all 326 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20181069The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief