Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 1,292 decisions within 5 km, 6 exact-site or onsite candidate records, and 1945 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1945 structured nearby appeal records.
1,945 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
PERMISSION FOR ERECTION OF 6 NO. 10 METER HIGH FLOOD LIGHTS
PERMISSION FOR EXTENSION TO EXISTING BUILDING COMPRISING 4SQM FOR LIFT INSTALLAT
Permission for the proposed 11m2 First Floor extension comprising new
Planning permission being sought from Wexford County Council for replacement dw
Permission for the proposed erection of alterations and extension to existing
Permission for replacement dwellinghouse, the development comprises
The brief summarizes the pattern across all 1,292 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20181381The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief