Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 171 decisions within 5 km, 5 exact-site or onsite candidate records, and 251 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
251 structured nearby appeal records.
251 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
RETENTION OF EXISTING DOMESTIC GARAGE
PERMISSION TO ERECT AN EXTENSION (SELF-CONTAINED RESIDENTIAL UNIT FOR USE BY A F
Permission to construct a new housing development comprising 15 houses as follow
Permission to construct a new housing development comprising 15 houses
Outline Planning Permission for the erection of three (3 No.) dwelling houses
PLANNING PERMISSION FOR DEVELOPMENT AT ST. ANNE'S CHURCH, A 'PROTECTED STRUCTURE
The brief summarizes the pattern across all 171 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20190180The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief