Executive snapshot
15% of nearby decided applications were refused. The site check found 299 decisions within 5 km, 1 exact-site or onsite candidate record, and 405 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
405 structured nearby appeal records.
405 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
PERMISSION FOR THE ERECTION OF A FULLY SERVICED NEW DWELLING HOUSE.
Permission for retention of a porch to the front of a dwelling house, retention
1. Permission for demolition of existing shed and erection of an office
Permission for (1) demolition of existing shed and erection of an office
Permission for the proposed replacement of a current single vehicular entrance
Permission for retention of a reinforced concrete boundary/retaining wall.
The brief summarizes the pattern across all 299 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20190336The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.