Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 522 decisions within 5 km, 7 exact-site or onsite candidate records, and 730 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
730 structured nearby appeal records.
730 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
PERMISSION FOR THE ERECTION OF A FULLY SERVICED DWELLING HOUSE AND GARAGE AND
PERMISSION FOR THE ERECTION OF A FULLY SERVICED DWELLINGHOUSE AND GARAGE AND ALL
Permission for the retention of change to dwelling house type previously granted
Permission for the installation and upgrade of a new sewerage system to serve th
Outline Planning Permission for the demolition of a structurally compromised
PERMISSION FOR THE ERECTION OF 2 NO. FULLY SERVICED 200M2 DORMER DWELLINGS
The brief summarizes the pattern across all 522 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20190652The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief