Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
19% of nearby decided applications were refused. The site check found 317 decisions within 5 km, 1 exact-site or onsite candidate record, and 450 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
450 structured nearby appeal records.
450 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
PERMISSION FOR THE CONSTRUCTION OF A FULLY SERVICED SINGLE STOREY DWELLING
PERMISSION FOR THE DEVELOPMENT OF: A SOLAR PV ENERGY DEVELOPMENT OF MAXIMUM
Retention permission for the minor elevation changes to electrical substation
Permission for the erection of a fully serviced dwelling house
Permission for Retention for amendments to a dwelling house constructed under
Permission for alterations to the approved planning permission and phasing
The brief summarizes the pattern across all 317 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20190851The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief