Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 230 decisions within 5 km, 1 exact-site or onsite candidate record, and 325 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
325 structured nearby appeal records.
325 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
PERMISSION TO ERECT AN EXTENSION TO INCLUDE AN ATTACHED DOMESTIC GARAGE/STORE
PERMISSION TO ERECT A LIVESTOCK CUBICLE HOUSE WITH UNDERGROUND EFFLUENT TANK, TO
Permission to erect a serviced dwelling house and to carry out associated ancil
Permission to erect a dwelling house with services and domestic garage
Permission to erect a general purpose agricultural shed in farmyard
Permission to erect a serviced dwelling house and to carry out all
The brief summarizes the pattern across all 230 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20200054The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief