Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 221 decisions within 5 km, 4 exact-site or onsite candidate records, and 331 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
331 structured nearby appeal records.
331 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Installation of a 5.8m bulk milk silo next to existing milking parlour
Permission for development at this site which is a protected structure. The
Permission for the following: Construction of a single-storey Medium Voltage
Permission to upgrade existing treatment system to EPA guidelines
Permission for retention of existing metal shed, existing dormer windows and fir
Permission for retention of changes to a dwelling house to include
The brief summarizes the pattern across all 221 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20201013The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief