Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 1,283 decisions within 5 km, 7 exact-site or onsite candidate records, and 1922 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1922 structured nearby appeal records.
1,922 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for new pedestrian access and pedestrian footpaths with alterations
Permission for retention of garage and store to side of existing dwelling house,
Permission for a proposed single storey biomass unit (new build area = 47m2) and
PERMISSION FOR THE ERECTION OF 18M MONOPOLE TO SUPPORT TELECOMMUNICATIONS
PERMISSION IS SOUGHT FOR THE DEMOLITION OF OLD OUT BUILDING/SHES OF 147SQM
Permission for the installation of 6kWp (28sq.m.) of photo-voltaic panels on the
The brief summarizes the pattern across all 1,283 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20220793The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief