3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 508 decisions within 5 km, 3 exact-site or onsite candidate records, and 618 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
618 structured nearby appeal records.
618 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for 9 no. additional silos at existing cement bagging facility
Permission for a proposed single storey ESB substation and switch room building
Permission for the construction of 2no. single storey storage facilities
Permission for the construction of an extension to an existing grain store fa
RETENTION OF PERMISSION FOR A CONSTRUCTED FRONT DRAFT LOBBY, REAR EXTENSION AND
Permission for extension at the rear elevation, also seek permission
The brief summarizes the pattern across all 508 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20240030The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief