Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
24% of nearby decided applications were refused. The site check found 283 decisions within 5 km, 1 exact-site or onsite candidate record, and 416 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
416 structured nearby appeal records.
416 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A ten year permission for development at Ballyvaldon and Ballyvoodock
RETENTION FOR THE CONSTRUCTION OF A DOMESTIC GARAGE
Permission for retention of dwelling house as constructed including all
Permission for the retention of dwelling house as constructed including all asso
Permission for the retention of dwelling house as constructed and all associated
Permission to erect an agricultural shed for storage of crops from meadow land
The brief summarizes the pattern across all 283 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20250509The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief