Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
24% of nearby decided applications were refused. The site check found 368 decisions within 5 km, 3 exact-site or onsite candidate records, and 537 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
537 structured nearby appeal records.
537 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for indefinite retention of the as-constructed golf maintenance shed
PERMISSION FOR A CHANGE OF SITE BOUNDARIES TO DWELLING HOUSE AS FROM THAT
Permission for a ground level helipad and all associated site development works
Permission for amendments to the surface water
10 YEAR PERMISSION FOR AN INTEGRATED HOLIDAY COMPLEX ON A SITE OF 72.3 HECTARES
Permission is sought to amend condition number 6 of current planning permission
The brief summarizes the pattern across all 368 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20250640The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief