Full planning permission is sought to demolish existing single storey garage, full planning permission is sought to construct 8 no. terraced two-storey townhouses with new site entrance, and all associated site works and services.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Greenhills , Leighlin Road , Graiguecullen
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
9% of nearby decided applications were refused. The preview found 654 nearby planning records within 5 km where a location match is available.
- Matched source
- 18104
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Retention permission for as built boundary wall and all associated site works
To construct two no. two storey dwelling houses, associated car parking and vehicular entrances, new site boundaries, general landscaping, connection to existing mains water and sewage and all associated site works
Construction of an ESB Medium Voltage substation (standard design) to include an adjacent customer switchroom and transformer on a concrete foundation and base, and all associated ancillary works. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application
Permission to construct 18 new houses and all associated site works
The development will consist of replacing existing front door with window and linear planter, widening existing side door to form front door, replacing garage door with window, corner window to side elevation, reducing size of rear sun room and adding additional room above attic level, solar panels to side elevation roof
Source match
Matched from public planning record 18104The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report