4 no 10 meter high lighting poles with flood lighting, erection of 2 no 10 metre high by 20m long ball stop netting barriers, associated site works including excavation
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
St Cronan's BNS , Vevay Crescent , Vevay Road
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
18% of nearby decided applications were refused. The preview found 1,931 nearby planning records within 5 km where a location match is available.
- Matched source
- 181114
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Section 42 on PRR 18/1114 ( (i) the erection of 4 No 10 meter high lighting poles with flood lighting, (ii) the erection of 2 No 10 meter high by 20m long ball stop netting barriers, (iii) associated site works including excavation
5m high ball stop netting barrier to the north east side of the playing pitch, associated site works including excavation
Revisions to a permitted residential (ref 16/253). The development will consist of the relocation of the ESB substation, the repositioning of two units on site (house type A and A1) including reconfiguration of associated gardens and car parking, boundary treatments, landscaping, and all associated site and engineering works necessary to facilitate the development. Carrigbrae House is a protected structure
Construction of a single storey stand-alone building consisting of two classrooms, one general activities room, one multi-sensory room, one office, associated ancillary spaces together with all associated works
Attic conversion, inclusive of 5 no. roof lights and the creation of habitable space with the attic space
Source match
Matched from public planning record 181114The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report