The development of a new 4th hole comprising of a new tee, fairway, green, pathways and other ancillary works. Works will also include the redesign of the existing 4th hole converting it into a practice academy as well as minor works to the current 3rd green surrounds
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
The Clubhouse , Greystones Road , Bray
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
16% of nearby decided applications were refused. The preview found 2,128 nearby planning records within 5 km where a location match is available.
- Matched source
- 181183
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Disconnection of the existing foul and surface water drainage from the existing shared drainage line with No.4 & No.6 Kilruddery Cottages which runs through the site, and the installation of a new independent treatment system and percolation area for No.1 & No.3 Kilruddery Cottages. Existing foul drainage line for No.4 & No.6 Kilruddery Cottages will remain active. Installation of new surface water soakaway to serve No.1 & No.3 Kilruddery Cottages. All associated landscaping, drainage, ancillary site works and services
Removal of the existing telecommunication structure and the erection of a 59.5m high lattice support structure carrying antennas and dishes
The proposal is for Phase 1 of a 2-phase housing development and will consist of: A) The construction of 96 no. dwellings (and single storey crèche c. 175 sq. m.) comprising 10 no. 2 bedroom 2 storey houses, 65 no. 3 bedroom 2 storey houses, 1 no. 4 bedroom detached house (3 storey to front 2 storey to rear), 6 no. 3 bedroom ‘Courtyard’ dwellings (2 storey), and 11 no. part 2 storey/3 storey 4 bedroom ‘Courtyard’ dwelling, 3 no. 1 bedroom apartments in 1 no. 3 storey building; B) All ancillary development works including footpaths, landscaping boundary treatments, public, private and communal open space areas (including balcony or terrace), car and bicycle parking, single storey ESB substations/bicycle stores regrading/re-profiling of site where required and all ancillary site development/construction works (and all new site services connections); C) Vehicular access will be from the Southern Cross Road (R768) via the existing entrance serving Kilruddery House & Gardens & Parklands Office Park. The works will entail the talking-down, relocation and reconfiguration of the existing Kilruddery entrance gates and piers (a protected structure) further within Kilruddery House & Gardens, with new access to the proposed residential development via new overall revised entrance arrangement (including to existing dwelling) and access route. It is also proposed to provide pedestrian access to the north and pedestrian access to eastern boundary (from R761); the proposed development will allow for all roads, services and landscaping for Phase 1 and Phase 2 sites;
Complete entrance granted under planning reference number 15/1168 with alterations to layout so that the entrance will differ from conditions 8 & 9 granted under that permission. it is now proposed to recess the entrance 5m from edge of road with splayed walls with overall width of 6-8m but to retain as much of the masonry wall as possible in order to protect privacy to both the dwelling house granted under 15/1168 and adjoining properties to the east of the main road
For Phase 2 of a 2-phase housing development and will consist of: (A) The construction of 34 no. dwellings comprising 12 no. 2 bedroom 2 storey townhouses, 14 no. 3 bedroom 2 storey townhouses, and 8 no. 3 bedroom 2 storey semi-detached houses; (B) All ancillary development works including footpaths, landscaping boundary treatments, public, private open space areas, car and bicycle parking, single storey ESB substations/bicycle stores, regarding/re-profiling of site where required and all ancillary site development/construction works (and all new site services connections); (C) Vehicular access will be from the Southern Cross Road (R768) via the existing entrance serving Kilruddery House & Gardens & Parklands Office Park. The works will entail the taking-down, relocation and reconfiguration of the existing Kilruddery entrance gates and piers (a protected structure) further within Kilruddery House & Gardens, with new access to the proposed residential development via new overall revised entrance arrangement (including to existing dwelling) and access route. It is also proposed to provide pedestrian access to north and pedestrian access to eastern boundary (from R761); the proposed development will allow for all roads, services and landscaping for Phase 1 and Phase 2 sites;
The full report covers all 2,128 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 181183The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report