Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 1,478 decisions within 5 km, 5 exact-site or onsite candidate records, and 124 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Limerick County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Limerick County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Limerick County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
124 structured nearby appeal records.
124 matchedNo current-dated citation is loaded for Limerick County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The construction of a two storey extension to the side of the dwelling, widening of the entrance piers and increased car-parking space to the front and all ancillary site works
A new front entrance porch, conversion of the existing side garage to a living room on ground floor and the building of two no. new bedrooms on first floor level. To the rear of the property it is proposed to build a single storey extension onto the existing kitchen
(a) demolition of existing chimney, (b) construction of single storey extension to front, side (north-east) and rear, (c) porch extension to front, (d) new ground floor window to side (South-west), (e) widening of existing ground floor window to sliding doors to rear and (f) all ancillary site works
(a) revisions to previously approved planning permission reg. ref. 19/487 comprising (i) omission of one window and raising cill of other window, both to north-east elevation of extension to side and (ii) change from brick finish to smooth sand and cement render to front elevation of side extension, (b) construction of 9.80 sqm single storey shed to side (south-west) elevation, (c) construction of 16 sqm open pergola structure to rear garden, (d) erection of timber panelling inside boundary walls, to a maximum height of 2,045mm, to side (south-west) and rear boundaries, (e) construction of garden wall to front to a maximum height of 1,425mm and (f) all associated site works
A single storey extension to side and rear of existing dwelling house and associated site works
The change of design of the proposed house extension and granny flat previously authorised under planning permission ref no. 21/626 and planning permission to construct a standalone private shed/home office to the rear of the property along with all associated site works
The brief summarizes the pattern across all 1,478 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 181199The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief