For the construction of an artificial grass all weather pitch and associated drainage works, pitch fencing, security cameras, pitch lighting, ancillary services and all associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Patricks Well , Rathvilly , Co. Carlow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 179 nearby planning records within 5 km where a location match is available.
- Matched source
- 18400
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for the construction of a club house to include, dressing rooms, kitchen, meeting room & storage areas. Permission for the construction of a secondary treatment system & soil polishing filter, bored well, connection to services and all associated site works
Construct a 24 meter monopole mobile and broadband tower with headframe carrying telecommunications equipment together with associated equipment and cabinets enclosed within a 2.4m palisade fence compound with access track.
Permission for development consisting of upgrade to the existing Water Treatment Plant comprising of installation of 2 no. self-bunded chemical bulk storage tanks located adjacent to the Intake Building and dosing kiosk enclosure. Installation of 3 no. self-bunded chemical bulk storage tanks adjacent to the WTP Building and 2 dosing kiosk enclosures. Installation of a concrete flocculation tank adjacent to the WTP Building. Construction of 3 no. concrete combined used wash water equalisation and settlement tanks. Construction of sludge infrastructure including a precast concrete sludge balancing tank, a precast concrete picket fence thickener tank and a precast concrete Sludge Holding Tank. Construction of a canopy onto the west elevation of the sludge building. Installation of emergency standby diesel generator with bunded fuel storage and acoustic enclosure on a concrete plinth. Installation of a new primary flow gauge within the River Slaney. Upgrade and extension of access road within the site. Site service and landscaping. All associated ancillary site development works above and below ground. A Natura Impact Statement accompanies this application.
Renovation and extension to existing dwelling and new domestic garage and all associated site works
To construct a part single storey, part one and a half storey dwelling, new entrance, bored well, septic tank, percolation area and all associated site works
Source match
Matched from public planning record 18400The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report