Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Three Stepping Stones , Kilnagun , Virginia

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

7% of nearby decided applications were refused. The preview found 258 nearby planning records within 5 km where a location match is available.

Matched source
18474
Project type
One-off house
Coverage
5 km radius
258Nearby applications
7%Refused
240Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

18474

Of the existing dwelling, PERMISSION for a proposed new domestic effluent treatment system and percolation area to replace existing wastewater disposal system and all associated site works

Granted0.0 km19 December 2018
2460059

For the retention of a detached domestic garage (previously domestic garage granted under planning reference 06256), and all ancillary site works

Granted0.3 km11 April 2024
2560257

For alterations to an existing dwelling, including: (a) the change of use of a garage into a granny flat; (b) the construction of a single storey carport linking the side of the existing dwelling with the proposed granny flat; (c) demolition of covered outdoor amenity area and part of existing low wall to facilitate the construction of (d) a single storey extension to the side of the existing dwelling

Granted0.9 km17 November 2025
2280

To retain an existing domestic garage and all associated site development works

Granted0.9 km25 April 2022
19232

To retain temporary mobile home located on site and PLANNING PERMISSION for (A) Demolition of flat roofed extension to rear of existing dwelling, (B) Construction of a storey and a half type extension and single storey extension to rear of existing dwelling, (C) Renovations to existing dwelling, (D) Construction of domestic garage, (E) Installation of septic tank and percolation area, (F) Maintain temporary mobile home located on site for an additional period of 12 months from date of a Final Grant of Permission and (G) All associated site development works

Granted1.0 km27 March 2020
18202

To retain a single storey detached home office and all associated site works

Granted1.0 km02 July 2018

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required