For a new machinery shelter together with an extension to an existing machinery shelter and all ancillary and associated site development works at Ballyhaise Agricultural College (Protected Structure)
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Drumcrow , Ballyhaise , Co. Cavan
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
7% of nearby decided applications were refused. The preview found 262 nearby planning records within 5 km where a location match is available.
- Matched source
- 18516
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
For construction of (i) Suckler shed extension (ii) Livestock underpass with effluent tank (iii) Sheep shed with underground slatted tanks, Wash & boot area, Medicine store, toilet, office and training room and all associated site works. SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED - NIS
Construct the following: (1) LV Switch Room & Electrical Substation to replace existing Switch room/substation (Drumcrow) (2) New machinery shelter (Elteen) together with all ancillary and associated site development works (protected structure)
For roof over existing Silage Pit together with all ancillary and associated site development works at Ballyhaise Agricultural College (Protected Structure)
For the construction of a 3 storey student accommodation block comprising 24 en-suite bedrooms, living and kitchen facilities, ground floor communal spaces and ancillary accommodation together with associated site works and services
For development which will provide for the the upgrade of the Ballyhaise Wastewater Treatment Plant and will generally comprise of the following: the construction of a new storm water holding tank complete with internal cleaning system, internal storm return pumps, access ladder and platform; construction of new sludge drying reed beds complete with sludge feed and filtrate return pipework and also a filtrate return pumping station; construction of new storm water forward feed and final effluent wash water pumping stations; installation of a kiosk to house electrical switchgear and all ancillary site works
Source match
Matched from public planning record 18516The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report