For new cladding over existing roof with new sign on the South Elevation and relocated signs on the East Elevation to the existing McDonald's Drive Thru Restaurant
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
McDonald's Drive Thru Restaurant , Gort Road , Ennis
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
7% of nearby decided applications were refused. The preview found 1,119 nearby planning records within 5 km where a location match is available.
- Matched source
- 18903
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For works to the existing McDonalds Drive Thru Restaurant to include a 4.2 Sq Meter extension to the East elevation, removal of existing entrance lobby to be replaced with a new 4 Sq meter extended entrance lobby with automatic sliding doors. New cladding over existing roof with additional signage and additional order point and menu sign in Drive Thru Lane and associated site works.
For development which will consist of the provision of office accommodation including ancillary areas at first floor level, over an existing supermarket unit (Previous planning references 07-21042 and 03-21171)
For development which will consist of a new glazed lobby at the entrance to the existing supermarket unit
For the development which consists of works to an existing ancillary building on the grounds of Ennis General Hospital (EGH), a protected structure (RPS No. 802, NIAH No: 20002020), which currently houses the EGH Pathology Laboratory, a boiler room, redundant generator room and store rooms. The development works will comprise the removal of existing partition walls and internal reconfigurations to provide an open plan Pathology Laboratory for Haematology and Biochemistry, with an entrance lobby for sample drop off and collection and other ancillary accommodation including a staff room, office, and store room; internal wall lining to thermally upgrade the building fabric; a new external plant enclosure centrally located at roof level to be accessed by altering and extending the existing external stairs with an additional stair flight; external conservation works to include the removal of later additions to the parapet wall, the reinstatement of a window opening (currently used as a door) on the south façade, the removal of attached service fittings, replacement of all non-original doors & windows, and repair works to the external render; along with associated site works and site services works for all of the above, all at the grounds of Ennis General Hospital,
For infill floors to first and second floor atrium
Source match
Matched from public planning record 18903The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report