To erect extension to existing building to include reception, waiting area, clinic room, canteen, store and toilet, roof lights to existing building and connection to existing services within the curtilage of the following protected structure- CV10011
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
The Gate House , Bridge Street Ballyconnell , Co. Cavan
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
3% of nearby decided applications were refused. The preview found 171 nearby planning records within 5 km where a location match is available.
- Matched source
- 19251
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For the erection of 2no. fully serviced two storey detached dwellings, form site entrances, connection to public services, boundary treatments and all ancillary site works. SIGNIFICANT FURTHER INFO HAS BEEN RECEIVED.
Construct 18 metre high free standing communications structure with its associated antennae, communication dishes, ground equipment and all associated site development works, this structure will replace the existing 16m structure on site at the exchange, the development will form part of Eircom Ltd existing telecommunications and broadband network
To extend shop floor space within existing Supervalu premises with internal alterations to offices & storage facilities and alteration to side elevation
For change of use of existing single storey building from HSE health centre to use as a childcare facility with alterations to plans & elevations and associated site works
Erect fully serviced single storey extension to rear of existing restaurant to incorporate restaurant and store and all ancillary works
Source match
Matched from public planning record 19251The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report