Remedial repair and strengthening work to existing weir which will incorporate a rock ramp fish pass in front of the existing weir. The fish pass will require the lowering of a section of the existing weir. A Natura Impact Statement (NIS) will be submitted
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Lower Tinnahinch Weir on the River Barrow , off the R705 in the townland of Tinnahinch , Co. Carlow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
6% of nearby decided applications were refused. The preview found 97 nearby planning records within 5 km where a location match is available.
- Matched source
- 19289
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The construction of dwelling house and associated garage together with the installation of a wastewater treatment system and percolation area and the formation of a new residential entrance, together with all associated landscaping boundary treatments and external siteworks
The construction of dwelling house, and associated garage together with the installation of a wastewater treatment system and percolation area and the formation of a new residential entrance, together with all associated landscaping boundary treatments and external siteworks
A new dwelling house with connection to existing services, proposed new well and all associated site works
Permission for the erect a granny flat extension to dwelling under construction, granted under Planning Reference Number 16/175 and all associated site works.
Erection of an extension to the rear of existing dwelling house and all associated site works
Source match
Matched from public planning record 19289The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report