Alterations to Kinneagh Glebe House (Protected structure RPS CW117), including a part two storey, part single storey extension to the side, a new septic tank and wastewater treatment system and all ancillary site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
The Glebe , Kinneagh , Tullow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 111 nearby planning records within 5 km where a location match is available.
- Matched source
- 19347
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
For construction of (1) milking parlour, dairy, plant room, office and drafting facility, (2) steel slurry tower, (3) collecting yard, (4) underground tank for grey/dirty water, (5) underground slurry tank, (6) outdoor cow cubicles, (7) associated site works
The construction of a two storey residential dwelling, detached garage, packaged wastewater treatment system and soil polishing filter, bored well and all associated site works
To construct a part single, part two storey dwelling, garage, bored well, septic tank & percolation area, new domestic entrance and all associated site works
A 10 year planning permission on lands including Straboe and Killerig, Carlow, Co. Carlow. The development will consist of permission for a Solar PV Energy Development with associated Battery Energy Storage System Compound with a total site area of c. 132.28ha, to include solar panels mounted on steel support structures, associated cabling and ducting, inverters, transformers, switchgear substations, auxiliary transformer, permanent storage containers, monitoring houses, composting toilet, BESS customer substation, battery blocks, BESS inverters and PCS (twin skid), BESS interface cabinets (BIC), backup generator, temporary construction compounds, tracks, boundary security fencing and security gates, CCTV, landscaping and ancillary works, with a 40year operational period. It is proposed that the Proposed Development will be accessed from four separate access points which will include (i) a new access created off the R726; (ii) a new entrance off Straboe Lane; (iii) a widened and improved existing entrance off Straboe lane; and (iv) use of an existing and previously consented entrance off the R418. A Natura Impact Statement (NIS) has been submitted to the Planning Authority with the Application
Retention permission for a single storey extension to the front and side of existing two storey dwelling house and all associated site works
Source match
Matched from public planning record 19347The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report