To RETAIN development on site which consists of the construction of a dormer residence and ancillary site works. The site entrance and the position of the structures is at variance with the site map submitted with the original application. The residence as built is at variance with the plans originally submitted for planning permission. An additional roadside gate has been provided for maintenance of the water treatment system.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Rockforest , Tubber , Co. Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
3% of nearby decided applications were refused. The preview found 38 nearby planning records within 5 km where a location match is available.
- Matched source
- 19697
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
To construct a new dwelling house, construct a new entrance, set back a section of the roadside boundary to improve sight distance and install an advanced wastewater treatment system along with all associated site works
For development, the development consists of the construction of an extension to existing agricultural building which will consist of roofing existing concrete yard, new slatted tank, new cubicle area, new milking parlour replacing old section of existing building and associated site works
To construct a dwelling house and detached garage, with effluent treatment system, new entrance from public road, and all associated site works
(Reference No. P23/130) to construct a dwelling house and detached garage, with effluent treatment system, new entrance from public road, and all associated site works
To alter and extend an existing house with a dormer-style extension, to replace an existing on-site wastewater treatment system, alterations to an existing site entrance and associated site works
Source match
Matched from public planning record 19697The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report