Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Old Gort Rd , Lifford , Ennis

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

7% of nearby decided applications were refused. The preview found 1,108 nearby planning records within 5 km where a location match is available.

Matched source
19840
Project type
One-off house
Coverage
5 km radius
1,108Nearby applications
7%Refused
1,033Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

19840

To (a) demolish existing cottage (b) construct 2 No detached dwelling houses, entrances and connections to existing public services together with all ancillary site development works

Refused0.0 km23 September 2020
2679

To Extend the Appropriate Period for planning permission P21/311 to (a) demolish existing cottage, (b) construct 2 no. detached dwellinghouses, entrances and connections to existing public services together with all ancillary site development works

Granted0.0 km30 April 2026
21311

To (a) demolish existing cottage, (b) construct 2 no. detached dwellinghouses, entrances and connections to existing public services together with all ancillary site development works

Granted0.0 km28 May 2021
20638

To RETAIN the alterations to the dwelling house granted under P15/639, for the removal of the front boundary wall and the construction of a driveway along with all associated and ancillary works

Granted0.1 km09 November 2020
2360092

The construction of a new day services building with office accommodation at first floor level and all associated site works

Granted0.2 km12 May 2023
2660236

For development consisting of the provision of additional floor area at first floor level to provide additional office accommodation within the existing training centre building envelope, the installation of new windows at first floor level, and all associated site works. RETENTION permission is also sought for internal alterations as constructed, including the subdivision of former workshop, canteen and office areas

Granted0.2 km29 May 2026

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required