For the construction of a forest access road and entrance with all ancillary site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Knockatullaghaun , Miltown Malbay , Co Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 145 nearby planning records within 5 km where a location match is available.
- Matched source
- 19906
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For the construction of a forest access road and entrance.
To demolish existing ancillary accommodation, construct an extension to the side (east) of the existing dwelling, minor alterations to the interior layout of existing dwelling. All with associated site works.
To renovate and extend the existing outbuilding to provide overnight accommodation for students attending the workshops at the teaching unit granted under P21/382 and all associated site and ancillary works
To alter part of granted planning permission reference P21382 to include revised elevations, floor plans and building layout for the proposed teaching unit with welfare facilities and office, along with all associated works
For 1. Change of use of a section of the exiting storage shed with workshop area, granted under P19-121, to provide a workshop area / teaching facility for blade smithing and knife making school, with its own new entrance door; 2. To replace the existing shed with a purpose built teaching unit with welfare facilities and office and 3. to upgrade the existing waste treatment system and all associated site and ancillary works
Source match
Matched from public planning record 19906The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report