3 no. velux roof-lights to the front elevation
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
105 Herbert Park , Bray , Co. Wicklow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
18% of nearby decided applications were refused. The preview found 1,957 nearby planning records within 5 km where a location match is available.
- Matched source
- 201151
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Dwelling to side of existing house. Permission includes the provision of a dwelling house which is two storey to front and 3 stories to rear, drainage, landscaping, boundary treatment, water connection, alterations to existing entrance and ancillary works
The construction of (1) a first-floor extension to the side, (2) a single-storey extension to the front of the existing dwelling and (3) widening of the existing driveway entrance to an overall width of 3.5metres
Amended attic level dormer structure to the rear. PERMISSION is also sought for development consisting of construction of a single storey extension to the side of the existing property incorporating rooflights, a single storey bay window and porch structure at the front of the dwelling, raising of the existing main roof level, together with associated site works
New single storey extension to ground floor living room and hall to front of dwelling, new window at ground floor level to existing side elevation and all associated site works
The alteration of Condition3 (a) of Planning Register Reference 16/519 to allow for a single part-time day care session of up to 5 hours from 9am - 2pm and to allow for 22no. children, within permitted structure
Source match
Matched from public planning record 201151The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report