Alteration to existing cottage to provide attic room, single storey extension to the rear of existing cottage, construction of detached garage, new waste water treatment system and ancillary site works. Also included in this application is permission to close existing entrance and opening of a new entrance to the property
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Quarterbridge , Sandyhills , Dunlavin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
16% of nearby decided applications were refused. The preview found 195 nearby planning records within 5 km where a location match is available.
- Matched source
- 201263
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Permission for change of use from restricted use as a dwelling to use by all classes of persons, (i.e. the removal of Condition 2(a) of Planning Reference 05-3728)
(i) the restoration of the authorised extraction area (3.7 Ha) as granted under planning permission 00/3343; (ii) the importation of inert soil and stones (EWC class 17 05 04) at a rate of 24,000 tones per annum to cumulative total of 96,000 tonnes; (iii) the renewed use of existing wheel wash and access area; (iv) the installation of a mobile welfare unit and portaloo for personnel working on site and associated civil works, within a landholding of 9.87 hectares for a term of five years
Garage as constructed on site, side extension as constructed on site to existing single storey bungalow and all associated site development works
8.4 hectare extension to the existing quarry permitted under PRR04/699 and substitute consent no. SU0012. Planning permission for the extraction of stone and gravel from the extended 8.4 hectare area at a rate of approximately 70,000 tonnes per annum. The proposed development also includes a portaloo, temporary portacabin office and canteen on site together with all ancillary works, wheelwash, weighbridge, well, pumphouse, berm and fencing
Wash plant, including a water recycling system, sludge storage bay, water storage tank and all ancillary works at the existing quarry
Source match
Matched from public planning record 201263The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report