To erect fully serviced 2 storey dwelling, detached garage, entrance, sewerage treatment facilities and all ancillary works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Corballyquill , Ashfield , Cootehill
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
4% of nearby decided applications were refused. The preview found 183 nearby planning records within 5 km where a location match is available.
- Matched source
- 20173
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
To erect a fully serviced 1.5 storey split-level style dwelling with detached domestic garage, entrance, bio-cycle treatment tank and all associated site development works. Significant further information and revised plans have been submitted
A change of house type from previously approved 1.5 storey dwelling (Pl. Ref. No. 08/1140) together with change of domestic garage plans. The revised proposal also includes a revised site layout consisting of relocation of the dwelling house and domestic garage
For the renovation and re-development of existing two-storey dwelling House to include the demolition of existing porch to front elevation and replacement with a new porch, demolition of existing attached domestic garage; re-development & change of use of existing two-storey lofted out-building to a 2 bedroom self-contained apartment, decommission existing septic tank and replacement with a wastewater treatment system and percolation area
To retain extension and alterations to existing dwelling and associated site works
To retain ground floor ensuite shower room extension to dwelling
Source match
Matched from public planning record 20173The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report