Retention permission and planning permission for retention and continuance of use of historic gravel pit development (1.49 hectares) for processing, aggregates, washing facilities and stockpiling areas (0.99 hectares), extraction area (0.50 hectares) and prospective extraction extension area of 0.7 hectares, including all associated civil works, at a maximum rate of 30,000 tonnes per annum for a period of 15 years.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Kilcarrig , Bagenalstown , Co. Carlow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 329 nearby planning records within 5 km where a location match is available.
- Matched source
- 20298
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for the erection of a new extension and the retention of a two storey extension to it's vehicle workshop
Permission to build a 1 and 1/2 story extension to existing dwelling, a porch to the front of existing dwelling, change of roof on existing utility room from a low pitch to A roof and construction of a single story domestic garage including carport and all auxiliary site works
Permission for the single storey extension to the side and rear of the existing dwelling including alterations to front elevation and all associated ancillary works
For the continued use of the existing 30m high communication structure carrying antennae and dished with all associated ground-mounted equipment, within an existing 2.4m high palisade compound following on from previous LPA ref no. 10/208
Revisions to previously permitted extensions to the existing dwelling under PL21/111
Source match
Matched from public planning record 20298The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report