Bungalow, detached domestic garage, effluent treatment system in accordance with EPA 2009 and associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Greenan Beg , Ballintombay Lower , Rathdrum
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 257 nearby planning records within 5 km where a location match is available.
- Matched source
- 2051
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
1. 2 No. 20ft shipping containers. To be kept on site for the duration of the construction phase; 2. temporary security fencing (Heras fencing) to be kept on site for the duration of the construction phase; Permission to 1. erect a single storey (147.30 sq.m floor area) machine store with a ridge height not exceeding 4.9m high; 2. erect 1.8m High Paladin perimeter fencing and entrance gates and perimeter hedgerow; 3. Bally Lusk stone driveway or similar approved stone; 4. and planning permission is also sought to remove condition number 2 granted under planning permission register reference number 21/961
Construction of two holiday homes, connection to existing effluent unit, together with all associated site works
Single storey dwelling, new shared vehicular entrance to serve the proposed dwelling and an agricultural entrance beside it to serve the adjoining land and to install a new treatment system and percolation area and all ancillary site works
Sewage treatment system and percolation area
Conversion of part of out buildings to a 2-bedroom apartment
Source match
Matched from public planning record 2051The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report