Ten year permission for film studio media campus. The development will consist of the construction of 73,511 sqm of film studio media campus floor space, made up of 15 buildings of varying height and gross internal floor area, with a maximum height of 17.5m and maximum individual gross internal floor area of 8882 sqm. The buildings will include film studio sound stages, production facilities, workshops and ancillary accommodation on a site of 18.53hectares and all associated ancillary structures, services and infrastructure. Vehicular access to the dev shall be via 4 no entrances, from the public roads the R774, the R762 and 2 from the internal IDA bus Technology Park Road. The proposal will involve the improvement and upgrade of the existing entranceway to the Mill Road R762 and the alteration of the entrance to the R774, pedestrian and cyclist paths, the provision of 722 car parking spaces, multipurpose coach, HGV parking, Winnebago parking and loading areas, 276 bicycle spaces, electric cart shelter and parking. All associated landscaping features, waste compounds, substations, feature entrance signage and tensile canopy structure with 12m high peaks to the R774 entrance, 13sqm coffee kiosk to animate the public plaza to Mill Road, large scale advertising panel to façade of building 1 and 10 and signage to coffee shop, way finding signage and identification signage to individual buildings, security check in buildings and associated security barriers, new pedestrian and cycle streel frame bridge with timber deck over the existing stream to the north, backlot areas to the south east, and occasional use of paved areas when not in use and landscape areas for backlot use, fencing and planting and to the perimeter of the site and all ancillary services and infrastructure. An Environmental Impact Assessment Report will be submitted
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
IDA Business and Technology Park , Killincarrig , Greystones
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 1,488 nearby planning records within 5 km where a location match is available.
- Matched source
- 20620
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Relocation of 3 number existing floodlights and the installation of 163m of new 1.8m high boundary fencing with ancillary siteworks
1. Proposed ground & first floor extension (290m2) to rear east facing elevation of existing Shoreline Leisure Facility to provide for extra studio space. 2. All ancillary site works
1. Proposed 148 no. solar array panels to southern roof and 146 no. solar array panels to northern roof of existing Shoreline Leisure 2. all ancillary site works to facilitate proposal at shoreline Leisure
Four roof lights and entrance door to the single storey element at the front (north elevation) of the house. Two roof lights on the west and two on the east of the roof. A new door proposed in the location of an existing window at the front (north elevation) of the single storey element
A single storey flat roof (including one roof light) extension of approximately 15m2 to the rear (south) and side (east) elevation of the building. The single storey flat roof extension is partially visible from the front (north) elevation with approximately 500mm in view. The extension set back approximately 8m behind front single storey pitched roof element. The installation of two roof lights to the existing front of the house, one on the west and one on the east of the roof of the single storey element
Source match
Matched from public planning record 20620The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report