For the construction of a vehicle testing centre, ancillary offices and associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Site 2 Shannon Free Zone , Shannon , Co Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
3% of nearby decided applications were refused. The preview found 505 nearby planning records within 5 km where a location match is available.
- Matched source
- 20700
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
To construct a new site entrance to the previously permitted NCT centre under Planning Application Reference No. P20/700
(1) to RETAIN the works as carried out on the NCT centre as permitted under P20-700 at relocated position on this site; and (2) to seek PERMISSION to complete the NCT centre at the relocated position on the site
For a change of use of the building from a vehicle testing centre to an educational facility providing Health and safety Training for Work Safe Training Systems Ltd
For alterations to the front and rear elevations of an existing industrial building; for the construction of 38 no. additional car parking spaces to the front and rear of the existing building and associated site works
For development which will consist of; the construction of advertising on the North elevation of the existing building, including 1.) an advertising billboard of 18.6 sqm and 2.) a cockpit of a plane projecting 3820mm from the façade of the building and all ancillary site works above and below ground
Source match
Matched from public planning record 20700The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report