The development consists of the construction of a slatted unit and associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Culleen , Drumline , Co Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
4% of nearby decided applications were refused. The preview found 617 nearby planning records within 5 km where a location match is available.
- Matched source
- 20712
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For development - the development consists of the construction of an new entrance onto public road, the construction of a road from that entrance of a road from that entrance using inert soil and stone class (170504) and using concrete class (170101) into farmyard and associated site works
For the development this site at the townlands of Mogullaan, Crossagh, Rathlaheen South, Culleen, Drumline and Ballycasey Beg, Co Clare. Planning Permission is sought for a duration of 10 years, with an operational life of 35 years from the date of commissioning. The proposed development comprises the construction and operation of a solar photovoltaic (PV) farm on a site of approximately 95 hectares. The project includes: (i) Ground-mounted solar arrays supported by steel frames, with an internal network cable facilitating connection to the Drumline 110kV substation. An internal network cable will be installed to enable an under-the-fence connection from the onsite transformer compound to the adjacent substation. The transformer compound will include an Independent Power Producer (IPP) building, a 110kV transformer, and an 18-metre-high lightning monopole mast. (ii) Underground electrical cabling and ducting, security fencing, CCTV stands. (iii) New internal access tracks and site entrance. (iv) Site drainage. (v) All ancillary site development works and apparatus. A Natura Impact Statement will also be submitted to the Planning Authority with this application
To construct a single dwelling house, advanced water treatment system and ancillary site works.
To renovate and extend existing dwelling house, connect to new wastewater treatment system and carry out all ancillary site works
For the construction of a detached single storey garage with single storey granny flat appended, connection to existing wastewater treatment system and percolation area, and all ancillary site and landscaping works
Source match
Matched from public planning record 20712The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report