Change of use (removal of condition 2 of Planning Register Reference 03/8050) from restricted use as a dwelling to use by all classes of persons
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Eadestown South , Baltinglass , Co. Wicklow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 244 nearby planning records within 5 km where a location match is available.
- Matched source
- 20735
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Conversion of existing domestic garage to mezzanine/open floor studio and cleaning room at first floor level and store, toilet/wash room and garage space at ground floor level
Dwelling house as constructed, domestic garage, poultry shed, sewerage treatment system, entrance, all as constructed and all ancillary site works
Single storey extension to the side of existing single storey dwelling house and full permission is sought to upgrade percolation area associated with the existing septic tank to accommodate same, all ancillary site works and services
1.) upgrading existing agriculture entrance to existing farm yard, works include widening existing entrance. 2.) New hardcore farm yard area and associate works and permission for new entrance walls and gate at the entrance to the public road and associate works
Recontouring of agricultural land through the importation of inert soil and stones for the consequential benefit to agriculture at Eadestown South. This will involve the importation of construction waste, LoW 17 05 04 only, and recovery of same through deposition on an area of 3.35 hectares within an overall application area of 3.50 hectares, with a total of approximately 100,000 tonnes, averaging 20,000 tonnes per annum, for a period of five years. Associated civil works include improvements to road access with splayed entrance and construction of internal road infrastructure
Source match
Matched from public planning record 20735The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report