To construct a new car park providing 7 No. staff car parking spaces and change of existing agricultural entrance to vehicular access, along with associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Doolin National School , Doolin , Co Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 189 nearby planning records within 5 km where a location match is available.
- Matched source
- 20789
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For a single storey extension with two classrooms, an accessible WC and associated circulation and site works all at Doolin National School
For the following development: for the construction of a Multi Use Games Area (MUGA) with associated site fencing, netting, artificial surface, 4 No. 10m high floodlighting poles associated fittings and all associated ancillary site development works
For development which will consist of construction of a new dwelling farmhouse with associated wastewater treatment system, site works and services and permission to use existing farm track as access road to proposed farmhouse
To Extend the Appropriate Period of Planning Permission for P19/120 for development which will consist of construction of a new dwelling farmhouse with associated wastewater treatment system, site works and services and permission to use existing farm track as access road to proposed farmhouse
The development will consist of a part one and part two storey extension to the existing hotel to include 27 bedrooms, a new hotel entrance and reception area, ancillary spaces including wellness suite (46sqm) and storage rooms. The total proposed Gross Internal Area (GIA) of the extension is 1688 sqm (Ground Floor: 1065 sqm & amp; First Floor: 623sqm). The development will include all associated site works including hard and soft landscaping, connection to existing waste treatment plant, a new vehicular set-down area, alterations to the internal road layout, additional bicycle parking and 28 new car parking spaces.
Source match
Matched from public planning record 20789The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report