Addition of a headframe to the existing 20 metre high communications structure (to provide a total overall height of 21.0 metres) to allow for additional equipment, within an existing palisade compound
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
ESB Telecoms' Compound , Pinewood Close , Boghall Road
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
17% of nearby decided applications were refused. The preview found 1,999 nearby planning records within 5 km where a location match is available.
- Matched source
- 20833
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Change of use from education / office facility to commercial / retail / office use
Removal of 22.4 sqm garage and shed, and subsequent construction of 50.4 sqm single storey extension incorporating garage, attached to north gable of 104.8 sqm house
Construction of a single storey timber 'barrel' sauna, and the retention of: a raised timber deck, a single storey timber lean-to structure including 4 changing bays and an outdoor shower area
To change condition no. 7 of granted planning permission no. 01630194 from number of children attending the morning session from 18 to 22 and the number of 1pm to remain unchanged, in line with Tusla allowances, at existing unit
1) demolition of existing derelict house and walls; 2) the construction of 9 houses comprising, one detached two storey two bedroom house with covered parking, five detached three storey three bedroom houses with covered parking and three detached three storey three bedroom houses and 3) alterations to vehicle area and new internal access road; 4) connection to public sewer; 5) removal of existing fence to southern boundary and 6) all associated site works
Source match
Matched from public planning record 20833The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report