Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Shannon Airport Authority DAC , Shannon Airport , Rineanna South Co Clare

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

2% of nearby decided applications were refused. The preview found 366 nearby planning records within 5 km where a location match is available.

Matched source
20886
Project type
One-off house
Coverage
5 km radius
366Nearby applications
2%Refused
358Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

20886

The development consists of the erection of a 68m linear, glazed and covered passenger walkway from departure gates area 1-5 to aircraft parking stand 26B

Granted0.0 km12 January 2021
2560304

For the demolition of existing metal framed cladded canopy within their lands at Shannon Airport and associated site clearance works along with all other site works to allow for future development on the site

Granted0.1 km17 July 2025
2460348

For development which will consist of the demolition of existing single storey administration offices, consolidation/protection works to the western end of the shared services building, the removal and upgrade of the facade to the eastern end of the main terminal building over 2 no. stories, the reconfiguration of the existing Airside personnel and passenger entrance/egress locations, new security fencing, hard and soft landscaping, with the provision of wayfinding and branding signage, including all associated site works. Demolition works will be carried out within the curtilage of a Protected Structure (RPS No.: 328)

Granted0.1 km19 September 2024
2460240

For development which will consist of a single-storey extension to existing Gates 1 to 5 departures terminal, provision of external plant area and covered external circulation routes. Other works include minor elevational changes to adjacent areas and alterations to personnel access/egress locations and routes with all associated site works

Granted0.1 km16 July 2024
17910

For proposed alterations and refurbishment works to the New Terminal Building at Shannon Airport. The development, within a Strategic Development Zone, will consist of upgrade works to the existing arrivals Hall at Shannon Airport including alterations to the existing southern and eastern elevations and provision of additional floor area of 42.5m2 to facilitate new Café and 16m2 for ancillary accommodation

Granted0.1 km19 January 2018
18514

For alterations and refurbishment works which were carried out to the New Terminal Building.

Granted0.2 km16 August 2018

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required