Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Tara , Newcastle Middle , Newcastle

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

19% of nearby decided applications were refused. The preview found 724 nearby planning records within 5 km where a location match is available.

Matched source
211011
Project type
One-off house
Coverage
5 km radius
724Nearby applications
19%Refused
583Conditional grants
2Refusal reasons

Top refusal reasons nearby

Procedure Invalid1
Visual Amenity1

Nearest similar decisions

211011

Proposed porches to front of existing house & existing family flat, extensions to rear of existing house & family flat (Total 20.20 sq. metres) & ancillary works including new window on side elevation of existing house

Granted0.0 km18 January 2022
211387

(1) New single storey extension to side of existing garage for use as home gym. (2) Conversion of existing garage to new home office. (3) All above with associated site works and for ancillary use of the home

Granted0.1 km30 May 2022
221380

Two storey dwelling house, new site entrance, installation of a wastewater treatment system & associated site works

Refused0.1 km20 April 2023
20865

Split-level two-storey house, an effluent treatment, and disposal system & improvements to the existing entrance and driveway

Granted0.2 km06 April 2021
22473

The construction of a new singles storey kitchen extension to the side of the existing house along with ancillary site works

Granted0.2 km21 June 2022
1886

The repositioning of the existing site entrance and boundary and the construction of two new single storey 4 bedroom dwellings, including a vehicle entrance and driveway, and all associated landscaping, boundary treatment, two individual wastewater treatment plants and percolation areas, drainage, water supply and site works

Granted0.3 km27 August 2018

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required