For the construction of a new metal fence on top of part of the existing stone boundary wall along the Smithstown Road combined height of wall and fence will be 2.45m high, the construction of a 2.45m high metal fence within the site behind the stone wall adjacent to the site entrance, the construction of a new 2.45m high paladin fence along the west boundary from the Smithstown Road boundary wall to the existing site security fence, and associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Irish Aviation Authority , Shannon Centre Smithstown Road , Ballycasey
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
4% of nearby decided applications were refused. The preview found 565 nearby planning records within 5 km where a location match is available.
- Matched source
- 211052
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
The development will consist of the construction of 22no. new car parking spaces with E-Chargers, and associated site works
For the construction of extensions to the rear and side of existing light engineering manufacturing facility including extension to front office area, revisions and extension of existing car parking layout, new storm attenuation tank with hydrobrake, revised site boundaries and all associated site works
For development at Bay K12, East Park, Smithstown, Shannon, Co. Clare. The development consists of the demolition of an existing office area with a replacement and new two storey extension office building to the front of an existing manufacturing unit with all ancillary landscaping and associated site works.
For the Construction of an extension to existing car park including modifications to existing car park layout. Works to include provision of new EV charging spaces, relocated wheelchair user parking spaces, line painting, footpaths, landscaping and erection of 3 no. 5 metre high flag poles & 2 no. covered bicycle parking shelters including all ancillary site works
For proposed development which will consist of the construction of a light industrial manufacturing facility with ancillary office space measuring circa 3,630m² comprising, A. a naturally lit high-bay workspace and a two-storey annex comprising administration and office spaces, sanitary and staff welfare facilities, B. The provision of external public lighting, a standalone ESB substation and switch room building, an enclosed external building services enclosure and an enclosed waste storage compound, C. Two new site entrances from the perimeter public roadways; a HGV entrance from the north off Smithstown Road to a dedicated goods yard and a second entrance from the east for all other vehicles, D. Parking for 76 cars, of which 17 are EV Charging spaces and 4 are Universal Access spaces, 38 bicycles under a covered shelter and a vehicular set-down zone, E. New ground level corporate signage to be placed at the south-west side of the adjacent roundabout on the Smithstown Road, F. Roof and ground mounted photovoltaic panels, building signage, ancillary soft and hard landscaping and all associated site works and services. The planning application is accompanied by a Natura Impact Statement
Source match
Matched from public planning record 211052The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report