Permission to demolish an existing house ruins and construct a single storey dwelling, appropriate waste water treatment system, proposed bored well, new entrance, conversion / change of use of existing agricultural outhouse to a domestic storage shed and all ancillary site works and landscaping
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Ballyryan , Nurney , Co. Carlow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 196 nearby planning records within 5 km where a location match is available.
- Matched source
- 21279
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
To construct a single storey dwelling, single storey garage, new domestic entrance from an existing agricultural laneway, septic tank & percolation area, bored well and all associated site works
Permission is sought for construction of a new dwelling with; packaged wastewater treatment system and polishing filter; bored well; splayed entrance and all associated site works.
4 no. total new windows at first floor level, comprising 2 no. new windows to east elevation, and 2 no. new windows to west elevation. The site is adjacent to Protected Structure RPS No. CW 413, NIAH No. 10301228
A 10 Year Planning Permission for a solar farm with a total area of circa 192 hectares. The solar farm will consist of solar panels on ground mounted frames, 30 no. single storey electrical inverter/transformer stations, 4 no. single storey spare parts containers, 4 no. Ring Main Units, 8 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 2 no. stream deck crossings and 1 no. horizontal directional drill, temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 4 no. entrances from the L3051, L3052 and L3050. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application
Extension of Duration of PL20/308 for the construction of a single storey dwelling, septic tank and percolation area, upgrading of existing entrance, bored well, connection to services and all associated site works
Source match
Matched from public planning record 21279The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report