To carry out internal and elevational modifications along with external covered seating area and associated site works and services
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Hassett's Public House , Barefield , Co Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
7% of nearby decided applications were refused. The preview found 560 nearby planning records within 5 km where a location match is available.
- Matched source
- 2164
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
To construct dwelling house, garage with loft, treatment system and ancillary site works with access via right-of-way to public road
To carry out the following development: for the extension of existing Footpaths and Junction realignment. The proposed development will include: 1) Realignment of existing Junction. 2) Set back existing stone wall and provision of 100m of 2m wide concrete footpath to North West of th Junction. 3) Extension of existing 2m wide footway for 40m along existing macadam surfacing to South West of the junction. 4) 1 No. Raised uncontrolled pedestrian crossing accross the L4158 (Ruan Road) 5) 1 No Raised uncontrolled pedestrian crossing the R458 to motorway. 6) 1 No. flush uncontrolled pedestrian crossing across R4159 to Ennis. 7) 1 No flush uncontrolled pedestrian crossing with seperation island, R458 to Crusheen. 8) 2 No Additional public Lighting columns and associated ancillary works to tie into existing public lighting system. 9) Provision of, Gullies, drainage pipework and associated ancillary works to existing public system. 10) Provision of associated Signage and Road Markings. 11. All associated and ancillary site works. In accordance with the Birds and Natural Habitats Directive, Screening for Appropriate Assessment has been carried out on the project. An Environmental Impact Assessment (EIA) screening statement has been prepared and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development
To construct a new dwelling house, access road, entrance, garage and install a new wastewater treatment system along with all associated works
As follows: (A) to RETAIN as constructed 2 storey dwelling house, garage & carport (previous planning ref. 92/20) (B) to RETAIN as constructed single storey granny flat (C) to RETAIN as constructed 2no. utility outbuildings (D) to RETAIN as constructed effluent treatment system & site boundaries etc. (E) All associated ancillary site works & services
To demolish existing garage and construct a new garage, lean to greenhouse and all ancillary site works
Source match
Matched from public planning record 2164The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report