To make alterations to two existing houses; provide link between them; demolish an existing structure; change the use from residential-Post Office to residential-Air B&B, and upgrade the existing wastewater management system
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Caher , Co Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
0% of nearby decided applications were refused. The preview found 75 nearby planning records within 5 km where a location match is available.
- Matched source
- 21837
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For the development which will consist of the demolition of a single storey storage shed to rear of existing dwelling and construct single storey extension in its place including all associated site works.
Of bathroom extension to dwellinghouse as constructed and associated site works
To: (1) convert and extend the existing barn into a work space, storage rooms, film editing rooms, and welcoming area; (2) construct a quiet nature room, for children to spend some time and reflect indoors after outdoor forest school sessions; (3) upgrade the existing sewage system
To: Reposition on lands the development as previously granted under Planning Ref. No:P18-159, e.g. for construction of a new detached 3 bedroom house, with associated garage, office, and studio, associated sewage treatment unit with percolation area and ancillary works all off existing road access. The design of the development is to remain essentially as previously granted. If this application is successful, the existing grant reference P18-159 is to be extinguished
For a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
Source match
Matched from public planning record 21837The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report