Single storey dwelling and domestic garage with a waste water treatment unit and percolation area to current EPA specifications, plus bored well, together with all associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Seabank , Sea Road , Arklow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 530 nearby planning records within 5 km where a location match is available.
- Matched source
- 21968
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Erection of a front porch, replace existing flat roof on rear of existing dwelling with pitched roof married into existing pitched roof by raising the height of the existing pitched roof by 800mm, to remove existing chimneys, install a solar panel on the new south facing roof, and to replace existing flat roof on existing shed/domestic garage to rear of existing dwelling with a pitched roof, together with all associated site works
Period of 10 years for a proposed solar farm and BESS (battery energy storage system) development which will consist of the construction of PV panels mounted on metal frames, inverters, battery storage infrastructure (BESS units, and MV Stations), new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, a temporary construction compound, a substation and all ancillary grid infrastructure and associated works. It is proposed to use the consented Ballymoney Solar Farm access point (Pl Ref: 19/627 and ABP Ref: 305289-19). The solar farm and BESS would be operational for 40 years. A Natura Impact Statement (NIS) will be submitted with this application
Construction of a bungalow with garage, a new entrance, a new treatment system and percolation area to current EPA standards and all ancillary site works
Solar farm within a site area of approx. 19 ha consisting of solar photovoltaic panels covering an area of up to 9.8 ha on ground mounted steel frames, 1 no on site substation, 3 no inverter / transformer stations, underground cables and ducts, boundary security fence, new internal tracks, CCTV cameras and all associated site services. Permission is sought for a period of 10 years
Amend the design of the approved development (Planning Reference: 19/627 and ABP-305289-19) which comprises consent for a Solar Farm within a site area of 19 hectares consisting of solar photovoltaic panels covering an area of up to 9.8ha on ground mounted steel frames, 1 no. on-site substation; 3 no. inverter/transformer stations, underground cables and ducts, boundary security fence, new internal tracks, CCTV cameras and all associated site services within the townland of Ballymoney, near Arklow, Co. Wicklow. Planning permission was sought for a period of 10 years. Proposed amendments include (1) relocation of part of the internal access track, and (2) a gate will be added along the access track
Source match
Matched from public planning record 21968The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report