Alterations to previously approved permission Reg. Ref. 22/10. The proposed alterations arise as a result of the applicant's interest within the wider development site area reducing from 2.816 hectares to 2.027 hectares and are as follows: (i) amalgamation of Blocks B & C and associated reduction in internal floor area of these blocks from 6,398sqm to 4,624sqm; (ii) reduction in number of vehicular parking spaces from 132 no. to 109 no. and reduction in number of bicycle parking spaces from 24 no. to 16 no.; and, (iii) all ancillary works, inclusive of SuDS drainage, necessary to facilitate the proposed development
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Lands at Southern Cross Road , Bray , Co. Wicklow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
16% of nearby decided applications were refused. The preview found 1,994 nearby planning records within 5 km where a location match is available.
- Matched source
- 221226
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
(i) removal of existing disused carparks and hard surfaced areas associated with the former Schering Plough site; (ii) provision of new vehicular entrance off Southern Cross Road with associated internal access road; (iii) construction of an employment park accessible via Southern Cross Road and consisting of 3 no. single storey logistics/distribution buildings, with ancillary office space at mezzanine level, served by 140 no. vehicular parking spaces, inclusive of 6 no. electric charging spaces and 7 no. accessible parking spaces and 24 no. bicycle parking spaces; (iv) provision of 1 no. totem signage post (2m x7.5m), to be located on Southern Cross Road; and (v) all ancillary works, inclusive of tree-planting, hard/soft landscaping, boundary treatment, provision of solar panels and SuDS drainage infrastructure, necessary to facilitate the development
Removal of existing disused carparks and hard surfaced areas associated with the former Schering Plough site, realignment / upgrading of existing access road to provide a new estate through road, with shared foot / cycle path, and connect Boghall Road and Southern Cross Road; provision of a new signalised junction on Southern Cross Road and upgrading works, inclusive of a new signalised junction and new pedestrian crossing facilities at the existing junction with Boghall Road, construction of an enterprise and employment park consisting of the following elements: 1 no 3 storey contemporary landmark office building (block K: 3509 sqm) comprising 3 no individual office suites varying in size from 875-1250 sqm and shared ground floor lobby (134 sqm) fronting on the Southern Cross Road to the south and the proposed estate through road to the east, 1 no single storey enterprise building (block H; 2684 sqm) consisting of 10 no enterprise / incubator units varying in size from 260-324.6 sqm, 1 no single storey logistics / distribution building (block G 4373 sqm) consisting of 5 no individual units varying in size from 544.1 - 1042.7 sqm with additional office space (58.3 sqm) at mezzanine level, 1 no single storey storage / logistics / distribution building (block F: 1064 sqm), with ancillary office spaces (58.3 sqm) at ground floor and mezzanine level and 1 no singe storey service station (block J 467 sqm) inclusive of forecourt convenience shop (99.5 sqm retail area), carwash facility, 2 no café / restaurant concession areas, toilets and ancillary staff area. The employment park will be serviced by 295 no vehicular parking spaces and 100 no bicycle parking spaces and associated site dev works include construction of 1 no single storey ESB substation (25 sqm), provision of signage posts including 6 no wayfinding signposts (2.1m x 1.8m) to be located within the employment park, 1 no totem sign post at Boghall Road (2m x 7.5m) and 2 no totem sign posts at Southern Cross Road (1 no 2m x 7.5m & 1 no 1.6m x 9m), tree planting, hard / soft landscaping and all associated boundary works, provision of street lighting, SuDS drainage infrastructure and all ancillary works necessary to facilitate the development
(i) construction of single storey service station extending to 230 sq.m (Building A) inclusive of forecourt, convenience shop (99 sq.m retail area), carwash facility, toilets and ancillary staff area; (ii) construction of single storey fuel depot/vehicle servicing and maintenance building extending to 208 sq.m (Building B) with associated ancillary/related uses including car parts, accessories and tyre sales; (iii) provision of 33 no. vehicular parking spaces, inclusive of 10 no. electric charging spaces and 2 no. accessible spaces, and 8 no. bicycle parking spaces; (iv) provision of 1 no. totem sign-post at Southern Cross Road (1.6m x9m); and, all ancillary works necessary to facilitate the development. Access to the site will be provided via the access road previously approved under Reg. Ref. 19/872
For a Solar PV Energy Development within a site of 0.975ha at Takeda Ireland Ltd, Bray Business Park, Kilruddery, Bray, Co. Wicklow. The development will consist of “the erection of a 1,413 no. (636 kWp) Solar PV Energy Development within a site area of 0.975ha in the western car-park of the Takeda Facility. The Solar PV Arrays will be ground mounted on steel supported car-ports in 6 no. separate arrangements, covering part of the existing carparking spaces (201 no. spaces) and pedestrian walkway. The proposed development will also include the construction of an invertor building 13.5sqm to the north-eastern portion of the car park, a revised access barrier to the car-park, and all associated cabling, ducting, landscaping and ancillary infrastructure and site development works necessary to facilitate the development
2 no. non-illuminated signs located on the south and north elevations. Permission is also sought for the erection of replacement fencing of c. 2.1 metres in height to enclose the existing outdoor area associated with the permitted creche
Source match
Matched from public planning record 221226The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report