A) the removal of container and demolition of existing outbuildings; b) access lane and gate to Kilbride cottage; c) construction of 2no. 2 bed semi-detached townhouses, with ground floor private open space and first floor balcony; d) bike and bin storage; e) boundary treatments and all associated siteworks within a two storey building
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Kilbride Cottage , Killarney Road , Bray
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
18% of nearby decided applications were refused. The preview found 1,942 nearby planning records within 5 km where a location match is available.
- Matched source
- 221351
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Removal of container and demolition of existing outbuildings, extension and rearrangement of existing office to provide for 51 sqm additional floor area, the construction of 2 no 1 bed apartments (50 sqm each), 2 no parking bays, site access from Kilbride Lane and all associated site works, in a part single / part two storey building to the rear of Kilbride Cottage
A) the removal of container and demolition of existing outbuildings; b) access lane and gate to Kilbride Cottage; c) construction of 2no. 2 bed duplex apartments, at first and second floor balconies; d) vehicular access from Kilbride Lane with bike and bin storage at ground floor; e) boundary treatments and all associated siteworks within a three storey building
Fingerpost sign
15 sqm second story extension over existing rear single storey extension. The extension will comprise of bedroom with addition of ensuite bathroom
Hoarding
Source match
Matched from public planning record 221351The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report