Two storey dwelling house, new site entrance, installation of a wastewater treatment system & associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Newcastle Middle , Co. Wicklow , A63 K792
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
19% of nearby decided applications were refused. The preview found 720 nearby planning records within 5 km where a location match is available.
- Matched source
- 221380
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Proposed porches to front of existing house & existing family flat, extensions to rear of existing house & family flat (Total 20.20 sq. metres) & ancillary works including new window on side elevation of existing house
(1) New single storey extension to side of existing garage for use as home gym. (2) Conversion of existing garage to new home office. (3) All above with associated site works and for ancillary use of the home
The repositioning of the existing site entrance and boundary and the construction of two new single storey 4 bedroom dwellings, including a vehicle entrance and driveway, and all associated landscaping, boundary treatment, two individual wastewater treatment plants and percolation areas, drainage, water supply and site works
(A)Five detached 5-bedroom two storey detached dwellings along with the provision of individual surface water soakaway to meet BRE Digest 365 standards for each dwelling house. (B) Provision of new vehicular entrance off main road providing for sufficient traffic sight lines onto public road along with all necessary ancillary and site works to facilitate this development. (C) Provision of internal road network servicing the development with new landscaped public park and green areas with new pedestrian and cycle paths whilst providing hard and soft landscaping within the development along with all associated site development, new boundary treatments and landscaping works. (D) Proposed connection of each of five dwellings to individual proposed waste water treatment systems and percolations areas to meet current EPA standards until such time that Newcastle waste water treatment plant has been upgraded and then the 5no. houses shall be connected into Newcastle waste water treatment plant and the individual waste water treatment systems shall then be decommissioned. (F) Installation of an underground storm water attenuation tank and connection to all public service utilities.
Split-level two-storey house, an effluent treatment, and disposal system & improvements to the existing entrance and driveway
Source match
Matched from public planning record 221380The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report